- (540)551-5518
- [email protected]
- Mon - Fri: 08:30 - 16:00 EST
T20181108.0098 – Hermes00I90 – Prewired PC3D-R Installation (Surfaced Mount)** UPDATE UNIT FROM DHCP TO IP***

Hermes
Contract
Posted 3 years ago
- Contact support once you are on site (contact information listed in signature)
- Find package (Ask GC/GM where package is located)
- Test sensor comms (Hook sensor directly into switch, confirm if POE port, or POE Injector)
- Send photos (Network room, network switch, 2x Wide angle at each entrance from inside the store)
- Send measurements (Mounting Height, Entrance Width)
- Terminate cable run with T568B
- Mount sensor in mockup position (mockup provided by tech support)
- Send photo’s (Wide angle shot of entrance, close up of sensor, labeled network cables, where POE Injector is left)
- Send network switch info (Switch make and model, port number for each sensor, patch panel port number for each sensor)
- Count test (Stand under sensor to verify sensor height, Entrance under 6′: 5in/5out, Entrance over 6′ 10in/10out)
Job Features
Job Category | Installation |
PC3D Surface Mount | pc3d-surface-mount |
PC3D Recessed Kit | pc3d-recessed-kit |